Here we gave a face lift to a very tired gravel drive where the gravel had been pushed deep in to the ground making the surface resemble crush and run. We created the new levels to install the granite Plaspave 60’s. sand blinded the surface installed the blocks sanded and final whack all in 5 days.
Face lift for a tired gravel drive Leeds
By Richard Dale|
2016-07-27T15:55:51+01:00
July 19th, 2016|Block Drives, Block Driveways, Drives|Comments Off on Face lift for a tired gravel drive Leeds